Malarkey Roofing Installation Instructions

Nailing pattern use four 4 fasteners for each starter shin gle.
Malarkey roofing installation instructions. To apply the rake drip edge start at the corner near the eave and work your way up lapping subsequent lengths of flashing over the lower pieces by a minimum of 2 51 mm. Drip edge flashing in accordance with 2015 international building code section 1507 2 9 3 and 2015 international residential building code section r905 2 8 5 install non corrosive 26 gauge sheet. System such as leaks and buckling increase if installed directly over wood board decks. 3 malarkey omniseal system installation instructions application in elevated temperatures.
Do not place fasteners in the seal down strip. 1 malarkey laminate shingle installation instructions. Malarkey recommends removing the existing roof covering for best performance and appearance. Install drip edge first along the eaves and later on the rakes once the field underlayment has been applied.
Kneeling or standing in front of the roll score the release film all the way across with a straight blade knife taking care not to cut the membrane itself. 3 malarkey 3 tab shingle installation instructions succeeding courses are full width the first course completely overlapping the starter and followed by courses half lapped over preceding courses on up the roof. Be sure to overlap the eave drip edge too. Be sure to overlap the eave drip edge too.
When re covering an existing shingle roof evaluation of the. Failure to use properly condi tioned deck materials can result in deck movement which can damage the roof covering and may void your warranty. 1 malarkey laminate shingle installation instructions. Malarkey roofing products should only be installed over decks that can sufficiently support the weight of the roofing system and transient load during application of the roofing system.
Residential building code section r905 2 8 5 drip edge flashing drip edge eave or rake metal is required along the eave and rake edges of shingle roofs. Allow arctic seal and malarkey right start udl to relax prior to installation. Begin at a lower corner of roof and roll out 2 3 feet of material 610 914 mm. Underlayment malarkey makes two types of underlayment the first being water resistant mechanically attachedfield underlayments right start udl and our secure start.
Malarkey arctic seal is self adhering but this attribute is affected by cold weather and moisture often making it necessary to fasten the underlayment in place until shingles can be applied. Underlayment is required on roof decks prior to the installation of malarkey shingles.